Ovingham Level Crossing Grade Separation

This project included the upgrade of the level crossing on Torrens Road, including grade separation of the existing intersection, realignment of Torrens Road and works at surrounding intersections.

HULLY and Crane Services collaborated to construct the Torrens Road Bridge, spanning a distance of approximately 170 meters. Our scope of work included excavation, pile breaking, formwork, reinforcement, concrete placement, and steel girder installation, all of which were executed while maintaining a live rail line below to minimize traffic disruptions.